icon
Share price
23.16 EUR
Positive 0.08 (+0.35%)
Dive deeper
Back to top
icon
Andover
Andover, United Kingdom
icon Contact us
icon Close form

    Do you have any questions? Fill out the form and contact one of our experts

    Our team specializes in providing advisory and support services for the development of aquatic projects in different sectors

    All fields marked with a * are mandatory. We require this information to ensure the best experience during the service

    First of all, we need some general information about you and how we can reach you


    Remember this last field is not mandatory

    We are halfway there

    Please, tell us about your job

    Select your job profile *

    Select the typical scope of projects you collaborate on *

    We are almost done

    We would like to listen you. What are you interested in and what do you need?

    Select your sector interest *

    Select your service interest *

    Do you need something specific? *

    To complete the submission of the form

    We need you to consent our policy



    Continue
    icon
    Fluidra supports the local community with high quality temporary facilities
    Andover is a town in the English county of Hampshire (UK). Its pool and sports hall closed in early 2017, and Andover's new leisure center opened in spring 2019. Test Valley Borough Council needed to maintain its facilities, so Fluidra and Total Swimming provided a temporary 25 m pool on the car park site on Shepherds Spring Lane, which can be removed with minimal impact when the new facilities open. The objective is to bring swimming to the entire population as a means of social well-being tool by providing a community pool for lessons and swimming. The swimming pool is a 1.2 m deep modular deck level pool built on top of a reinforced concrete slab that is placed on top of the car park surface. The facility includes male and female changing areas, a viewing area, an office and a reception area. All facilities are contained in a temporary building, which was erected in ten days following completion of the concrete slab. The building, pool and ground bearing slab can all be disassembled and removed at the end of the hire period. As one of many projects for Fluidra and Total Swimming, Box Architects provided the principal architectural and designer services from planning onwards. To keep swimming facilities in place for the local community, the project was delivered at a rapid pace. The whole project was built in just 20 weeks.